Denarius Metals Corp. provided an update on the initial drill results from its 2026 surface in-fill diamond drilling program on the Las Brisas Target at its Zancudo Project in Colombia.
The results announced have been received from the final assays for the first four drill holes totaling approximately 660 meters carried out from the first purpose-built surface drill platform.
Multiple high gold and silver grade intercepts were intersected in the first in-fill drill holes completed on the Las Brisas Target, providing further confirmation of the high-grade nature of the mineralization previously modelled on the Manto Antiguo and Santa Catalina structures.
Serafino Iacono, Executive Chairman of Denarius Metals, commented, "This early progress at the Las Brisas Target reinforces our confidence in the continuity and quality of the known ore deposits at Zancudo. The 2026 in-fill drilling program has been designed taking into account the successful results achieved in our 2024 in-fill drilling campaign and underscores the potential and prospectivity of delineating new zones and expanding existing ones near planned mining infrastructures. We look forward to providing further updates through the course of this year's drilling campaign".
Las Brisas Target
The Las Brisas Target represents an unexploited block within the Manto Antiguo structure preserved by past mining. The in-fill drilling program for the Las Brisas Target has been designed at 50x50 meters drill centers from eight platforms (IF-5 to IF-12) aimed at better delineating and confirming the consistency of mineralization on the two ore-shoots outlined by previous drilling on the Manto Antiguo and Santa Catalina structures, of which the Manto Antiguo ore shoot is controlled by the intersection of the Manto Antiguo and Santa Catalina structures and which usually shows wider and higher-grade intercepts.
The drilling program on the Las Brisas Target commenced in late April 2026 with one drill rig operating from purpose-built surface drill platforms and comprises a total of approximately 6,000 meters of drilling to be carried out in 29 diamond drill holes.